The Ontario Building Code after the October 1, 2026 amendments.

This guide covers the current Ontario Amendments to the National Building Code of Canada 2020, dated October 1, 2026 under O. Reg. 325/26, and explains which July 17 rules remain unchanged.

  • Guides
  • Insights
  • Tools
  • Proof
  • Picks

Anyone pulling a permit in Ontario this fall, including one for a backwater valve or other basement flood work, is working under a building code made of two documents read together. The Ontario Amendments document has carried five different dates since October 2025. The current edition is dated October 1, 2026. A line-by-line comparison of the July and October editions found that Articles 7.2.5.16 and 7.4.6.4, discussed below, are unchanged.

What the code is made of right now

Section 1 of Ontario Regulation 163/24 says what the code is. The National Building Code of Canada 2020 (First Printing), issued by the Canadian Commission on Building and Fire Codes at the National Research Council, and a Ministry of Municipal Affairs and Housing document titled Ontario Amendments to the National Building Code of Canada 2020, dated October 1, 2026, are together adopted as the building code.

That date comes from O. Reg. 325/26. Made on October 1 and filed on October 2, 2026, it struck out July 17, 2026 and substituted October 1, 2026. It came into force when filed. Since October 2, 2026, the October 1 document is the one a building department reads a new permit against.

Five dates since October 2025

The national code has stayed the same throughout. What moves is the date of the Ontario amendments document named in section 1. Each change was made by a short amending regulation:

  • October 21, 2025, set by O. Reg. 247/25, made October 31, 2025.
  • April 1, 2026, set by O. Reg. 110/26, made April 17, 2026.
  • April 21, 2026, set by O. Reg. 119/26, made April 28, 2026.
  • July 17, 2026, set by O. Reg. 242/26, made July 22, 2026.
  • October 1, 2026, set by O. Reg. 325/26, made October 1 and filed October 2, 2026.

Why the document date matters to you

The date on the cover of the amendments document is not the day it took effect. The four 2026 amending regulations each came into force when filed, after the date printed on the document. The July edition, for example, is dated July 17 and O. Reg. 242/26 was made on July 22. The current October edition was named by O. Reg. 325/26, made October 1 and filed October 2. If a quote, a drawing or an online guide refers to the Ontario amendments, the cover date tells you which version it was written against. A copy dated July 17, 2026 or earlier is out of date.

What changed in the July 17, 2026 edition

The Ministry's July 22, 2026 announcement described two changes in the July edition. The October 1 document also changes parts of Part 3, Article 9.31.1.1 and Part 8. The copy used to check those changes is a CodeNews mirror, not an official Ministry-hosted PDF. This guide reports the two plumbing articles compared below; both are unchanged between July 17 and October 1.

Comparing the two documents line by line shows the plumbing change in Division B, Article 7.2.5.16. The April 21 version allowed cellular core PVC pipe only in residential buildings containing 1 or 2 dwelling units and in row houses that do not exceed 3 storeys in height. The July 17 edition expanded its use to a building of residential occupancy permitted to be of combustible construction, which the Ministry's announcement described as combustible buildings up to six storeys. The October 1 edition retains that rule. A line-by-line comparison found Article 7.2.5.16 unchanged between those editions: the current text still requires the pipe to meet ASTM F3128 and be light grey as specified in CSA B181.2, and requires its fittings and solvent cements to meet CSA B181.2.

What it left alone: the backwater valve rule

For basement flood work, the article that matters most is Article 7.4.6.4, Protection from Backflow, and the October 1 edition repeats the July 17 text. A backwater valve in a building drain must be a normally open design that meets one of the listed CSA pipe standards, and it may not serve more than one dwelling unit.

The city rebate programs in this guide tie their valve requirements to that same article, and that rule remained unchanged in the October 1 edition. The rebate guide has a rule card for each city, and the backwater valve rules page explains why only a normally open mainline valve counts.

Permits from before 2025

The current code took over from Ontario Regulation 332/12 at the start of 2025, and section 2 of O. Reg. 163/24 keeps the older code in force for some projects that were already underway. Those projects are the ones with a permit issued on or before December 31, 2024, or with drawings substantially complete by that date and a permit application made on or before March 31, 2025. The older code only carries over if construction began within six months after the permit was issued. If you have an older permit that stalled, the building department can tell you which code it sits under.

Where to read each part

  • The National Building Code of Canada 2020 is free in electronic form through the National Research Council's Publications Archive. Print copies are sold through the NRC Virtual Store.
  • Publications Ontario offers a free PDF of the 2024 Building Code Compendium, but its listing says updated to January 16, 2025, and the two free amendment packages it lists stop at that date too. That is useful background, but it predates all five Ontario amendments documents listed above.
  • The official 2024 Building Code Compendium HTML page, checked October 31, reflects amendments through O. Reg. 242/26 (July 22, 2026), not the October 1 document. The comparison above found Articles 7.2.5.16 and 7.4.6.4 unchanged in the October edition. See Part 7 - Plumbing for the published plumbing text. Use e-Laws for the regulation's current legal text.
  • The current wording of section 1 of O. Reg. 163/24 on e-Laws is the quickest way to confirm which amendments document is in force on the day you check.

Sources

  1. SRCO. Reg. 325/26, made October 1 and filed October 2, 2026; replaced July 17 with October 1 and came into force on filing.ontario.ca · checked Oct 31
  2. SRCCodeNews mirror of the Ontario Amendments document dated October 1, 2026; article comparison for 7.2.5.16 and 7.4.6.4. Moderate evidence because the Ministry has not posted a public PDF.codenews.ca · checked Oct 31
  3. SRCO. Reg. 163/24: BUILDING CODE, section 1ontario.ca · checked Oct 31
  4. SRCe-Laws source regulations O. Reg. 247/25, O. Reg. 110/26, O. Reg. 119/26, O. Reg. 242/26 and O. Reg. 325/26 amending O. Reg. 163/24 (Building Code); the consolidated section 1 history line lists these five amendments, checked 2026-10-31ontario.ca · checked Oct 31
  5. SRCMinistry of Municipal Affairs and Housing, Ontario Amendments to the National Building Code of Canada 2020, dated July 17, 2026, Division B Article 7.2.5.16, compared line by line with the April 21, 2026 edition (https://www.codenews.ca/OBC/OBC2024/Ontario%20Amendments%20to%20the%20National%20Building%20Code%20of%20Canada%20-%202026-04-21.pdf); both read 2026-09-27 from the codenews.ca mirrorcodenews.ca · checked Sep 27
  6. SRCMinistry of Municipal Affairs and Housing, Ontario Amendments to the National Building Code of Canada 2020, dated July 17, 2026, Division B Article 7.4.6.4, compared with the April 21, 2026 edition (https://www.codenews.ca/OBC/OBC2024/Ontario%20Amendments%20to%20the%20National%20Building%20Code%20of%20Canada%20-%202026-04-21.pdf); the text matched apart from whitespace; both read 2026-09-27 from the codenews.ca mirrorcodenews.ca · checked Sep 27
  7. SRCO. Reg. 163/24: BUILDING CODE, section 2ontario.ca · checked Sep 27
  8. SRCNational Research Council Canada, National Building Code of Canada 2020 publication page (date modified 2023-06-14), and Publications Ontario, Building Code and Fire Code catalogue (https://www.publications.gov.on.ca/browse-catalogues/building-code-and-guides), both read 2026-09-27nrc.canada.ca · checked Sep 27
  9. SRCOntario 2024 Building Code Compendium, current HTML reflecting O. Reg. 242/26, checked 2026-10-23ontario.ca · checked Oct 23
  10. SRCOntario 2024 Building Code Compendium, Part 7 - Plumbing; Articles 7.2.5.16 and 7.4.6.4, checked 2026-10-23ontario.ca · checked Oct 23